Bridge built crossing from Baja California east across the Gulf of California through 2050
Basic
3
Ṁ452051
24%
chance
1D
1W
1M
ALL
At least some work must have started and project must be funded and on track
It can't just be at the very top - it should be at least 20 miles long.
This question is managed and resolved by Manifold.
Get
1,000
and3.00
Related questions
Related questions
Bridge built crossing from the Yucatan to Cuba through 2050
10% chance
Bridge built connecting Newfoundland to mainland Canada through 2040
22% chance
Bridge built connecting any major Philippine island through 2040
36% chance
Bridge built connecting mainland Italy to Sicily through 2030
19% chance
Will a crossing of the Strait of Gibraltar, between Morocco and Spain, have started construction by 2035?
33% chance
Bridge built connecting Hainan to mainland China through 2040
40% chance
Bridge built connecting any of Cuba, Jamaica, Haiti, DR, and PR to each other through 2040
23% chance
Bridge built connecting Uruguay to Argentina near B.A. any time through 2040
40% chance
Bridge built connecting Vancouver island to the mainland through 2040
15% chance
Bridge built connecting any major Hawaiian islands through 2040
13% chance